Considerable savings through product development

It is possible to achieve considerable results within a short period of time through product development. The illustrated component was optimized and redesigned for a big customer over a period of 4 months. The weight of the component was reduced from 135 kg to 115 kg and a cost reduction of 13% was achieved at the same time. The stress level of the component was reduced from 450 to 350 MPa and the new component can be considered virtually indestructible.